Port Flow Engineering
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Port Flow Engineering, Automotive Service, Kelowna, BC.
06/11/2026
This one took a while- 6 point roll bar with removable door bars. All 1-3/4" 0.120" wall Dom tubing. All tube joints tig welded. Built to 2026 nhra rule book, good for down to 10 second quarter mile in a car with stock firewall and floor pans. A bit of a challenge fitting everything around stock seats and door panels, but this car is driven on the street-
04/17/2026
New billet side cover from CMS installed. All buttoned up and ready to go-
04/17/2026
Going back together, all new gears, synchros and bearings, lock-wired roll pins and steel 3-4 shift fork.
Click here to claim your Sponsored Listing.