Meade Utilities ltd

Meade Utilities ltd

Share

Domestic, Commercial & Industrial gas mechanical boiler engineers. Specialising in Maintance - Installations - Repairs.

Stuart's fundraiser for Cancer Research UK 08/11/2025

πŸ₯Š 🌟 - Today’s the day one of our own Stuart Thomas is putting down the tools and picking up the gloves for a great cause! So let’s all jump on and get behind him for one final push! - 🌟 πŸ₯Š

Stuart's fundraiser for Cancer Research UK Help Stuart Thomas raise money to support Cancer Research UK

Photos from Meade Utilities ltd's post 02/11/2024

πŸ”§ Not just your average boiler change this past week but definitely one of the most interesting jobs recently. To remove four Worcester Bosch gb162 boilers which had served their time and needing replacing. These boilers served for heating a swimming pool and gym area, also providing hot water. πŸ”§

πŸ’¦ After careful consideration and communication with the onsite maintenance staff a date was set for work to commence in the half term for minimal disruption. One of the most challenging obstacle to overcome was keeping the pool temperature up while the existing boilers could be decommissioned and removed. We were able to minimise downtime by removing all but one boiler to provide heat. While the new cascade system and boilers could be partly assembled and moved into place as quick as possible. Resulting in the overall pool temperature only dropping from 29 to 26! πŸ’¦

πŸ”₯ x4 new Ideal evo max 100kw boilers were chosen. A plate heat exchanger was used for hydraulic separation and protection keeping the older pipework separate from the new boilers heat exchangers. This reduces the risk of blockages and restrictions in the future from poor water quality. πŸ”₯

πŸ”© All accosiated flow and return pipework including a new gas supply was installed, strength tested, purged, tightness tested and commissioned to the highest standard. Using 54mm press fittings to complete the process with no β€˜hot works’ allowed on site πŸ”©

πŸ’¨ A new Flue 250mm system was installed as the old terminal had become brittle and broke causing condensation to leak back into the plant room. πŸ’¨

⚑️ All that was left was to hand over to the electricians to wire up the safety devices and boilers to the Trend BMS for all the monitoring and controlling to optimise the new boilers so they could efficiently and cost effectively for the client. ⚑️

So if you have a challenging project you’d like us to take a look at…

πŸ“§[email protected]
πŸ“±- 07557273795
πŸ’» - www.meade-utilities.co.uk

βœ…

plant room

Photos from Meade Utilities ltd's post 10/05/2024

πŸ”₯ Most boiler breakdowns can sometimes be avoided with regular maintenance and testing πŸ‘¨πŸ»β€πŸ”§ … That’s what was on the agenda today! A local care home had its annual boiler and plant room inspection today. These two EvoMax 100’s had a full strip down and change of combustion gaskets to insure everything was in good working order and that they continue to provide on going heating and hot water for all the residents πŸ’¦ 🚿

Want your business to be the top-listed Contractor in Reading?
Click here to claim your Sponsored Listing.

Telephone

Address

Reading