Alter Vision Studio
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Alter Vision Studio, Architectural Designer, Kuala Lumpur.
24/12/2018
Foundation Layouts Drawing Plan It is one of the most important drawing plans in all of the drawings. Because in this drawing the location of the column and its footing was mentioned. It is also important because with the help of this drawing we can indicate every column easily.
Project : Design & Built of 1 Unit 2 Storey Bungalow House.
Location : Desa Pinggiran Putra, Putrajaya, Malaysia.
Built-up Area : 5,000++ sqft.
Design by : .27
Rendered by :
With amazing featured exterior wall! Stay tune for more interesting post and information! 👍🏻💫
For more information please visit our
Facebook, Instagram, Twitter : .27
Any enquiry please Direct Message(DM) us for
FREE QUOTATION. ‼️💯🆓
09/11/2018
Difference between Plinth beam and Tie beam and their purpose in construction Now coming to the difference between plinth beam and tie beam. Actually, there is no difference between them. Tie beam is also a type of plinth beam. When tie beam is provided at plinth level it is known as plinth beam. That means the only difference is the height at which they are provided.
Click here to claim your Sponsored Listing.