Pushpropertiesng

Pushpropertiesng

Share

We push properties to the right buyers. Your trusted marketplace for land, homes & investment opportunities.

09/01/2025

Fully Finished Luxury 1-Apartment in the heart of Lekki.

Photos 24/10/2019

Before any construction is commenced, a SOIL TEST must be carried out to at least determine the LOAD BEARING CAPACITY of the soil.

This will prevent tilting, sinking or Total collapse of the building.

DM for more Details.

23/10/2019

What to Suspect when your Submersible Pump keeps Tripping off.

-Confirm the capacity of the machine.
-Compare machine capacity to the capacitor ( this is necessary if machine is connected to a treatment panel).
-Change capacitor if necessary.
-Bypass relay to check if machine will work. If working, Replace capacitor box.
-If machine keeps Tripping off, check the connection from the borehole.

DM for more tips.

22/10/2019

What to check during your AC maintenance.

22/10/2019

The use of DPM (DAMP PROOF MEMBRANE ) before laying interlock stone prevents w**d growth which alters the aesthetics of the finished work.

What other function can DMP possibly do ?
Feel free to share your thoughts.

Want your business to be the top-listed Realtor/realty Service in Lagos?
Click here to claim your Sponsored Listing.

Website

Address

Lagos