Next Generation HVAC

Next Generation HVAC

Share

BSC Mechanical Engineering Technology 🛠️
DAE Mechanical specialize in HVAC&R
🎓 Graduated from UET, Lahore

28/02/2025

What is FAHU?
FAHU stands for Fresh Air Handling Unit. It's an HVAC device that improves indoor air quality by filtering, heating, cooling, humidifying, or dehumidifying outdoor air.
Trane TVR 6Gi Series VRF inverter
Project Services Hospital Lahore Pakistan
VRf copper brazing perform Mecatech (Private) Limited ASHRAE UET Lahore Student Branch Sultan Shah Govt. College of Technology Railway Road, Lahore Trane VRF VRV group VRF Klima Sistemleri

08/01/2025

Trane TVR 6Gi Series Vrf system
Project: Services Hospital Lahore, Pakistan
Main pipes connected to Outdoor unit.

Photos from Next Generation HVAC's post 05/01/2025

Perforated cable tray working on site. Cable trays mainly support the laid main riser pipes which usually come from the bottom of the building (zone) to the top roof of the building where the main riser pipes are connected to the outdoor units.
Some building constructions provide base risers (ventilation alleys) or shafts through which the unit pipes are laid in the main riser pipe.
Project Services hospital Lahore, Pak
Trane TVR 6GI SERIES

23/12/2024

Project Services hospital LAHORE PAKISTAN
Fresh Air handling unit(FAHU)

Want your business to be the top-listed Contractor in Lahore?
Click here to claim your Sponsored Listing.

Telephone

Website

Address

Shad Bagh
Lahore
LAHORE