Here’s a look at a recently completed replacement of Kaiser’s potable water overhead mains.

This system had been a persistent source of leaks and mill stoppages for years, making ex*****on just as important as design.

Bronco delivered:

- 1,000+ LF of 12” and 8” potable water mains replaced

- 100% field routed and field fabricated

- Installed 50’ above a fully operational production floor

- Executed inside a 24/7 running facility

Working at elevation in a live production environment required detailed planning, tight coordination, and constant communication with our client to minimize mill disruption.

As important as our planning was, the ability to remain flexible enough to take advantage of installation opportunities arising from unplanned and unexpected outages in mill production was equally critical.

Success in projects like this comes down to communication, agility, precision, and ex*****on under real operating conditions.

Read more about this project here ➡️ https://broncoind.com/newsroom/2026/4/15/potable-water-overhead-mains-replacement-completed-at-kaisers-aluminum-mill

04/08/2026

Pictured here are frames that are part of a facility that will be used for rocket engine testing.

The north rail of this project is complete and ready to move to our paint area.

This is an exciting new project for us, and we are looking forward to sharing more as the project progresses.

Learn more about our fabrication capabilities ➡️ https://broncoind.com/fabrication

Want your business to be the top-listed Engineering Company in Baton Rouge?
Click here to claim your Sponsored Listing.

Telephone

Address

8550 UNITED PLAZA Boulevard SUITE 620
Baton Rouge, LA
70809

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm