Metro Infrastructure
Metro Infrastructure specializes in Horizontal Directional Drilling, Trenching, Fiber Fusing, Hydravoc Excavation across the GTA
07/14/2026
🔥 National Grilling Month
Week 3: Safety First! 🚒🔥
Before the burgers hit the grill:
✔ Clean grease buildup
✔ Keep your grill away from structures
✔ Never leave the grill unattended
✔ Use long-handled tools
✔ Keep a spray bottle or extinguisher nearby
Great BBQ memories start with safe grilling.
What’s one grill safety rule you never skip?
06/11/2026
⚽ FIFA excitement kicks off June 12 with Canada vs. Bosnia and Herzegovina in Toronto, while the USA takes on Paraguay in Los Angeles as the world comes together for one of the biggest sporting events on the planet.
With increased traffic, larger crowds, and busy roadways expected around viewing events and host cities, Metro Infrastructure reminds everyone to stay alert, drive safely, and slow down in active work zones.
Great teamwork wins games — and safe teamwork keeps our communities connected.
Who are you cheering for this FIFA season? 👇⚽
06/10/2026
Underground utilities are like family recipes…
Sometimes there are extra ingredients nobody told you about. 😆
While vacing for a located TV cable, our crew uncovered several abandoned utilities that weren’t identified on the locates — including an old gas main and clay pipe.
Thankfully, the team recognized something didn’t look right and immediately paused work to confirm findings with the locator.
Safe digging starts with good locates — and even better awareness in the field. 👏
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
10 Edvac Drive
Brampton, ON
L6S5P2
Opening Hours
| Monday | 8am - 6:30pm |
| Tuesday | 8am - 6:30pm |
| Wednesday | 8am - 6:30pm |
| Thursday | 8am - 6:30pm |
| Friday | 8am - 6:30pm |