TOIR Metalshaping

TOIR Metalshaping

Share

TOIR Metalshaping

01/12/2022

Trunk Floor strength rib/swage pre-stretch

Photos from TOIR Metalshaping's post 10/09/2021

Little pre-stretch on the powerhammer. Showing the die guides made to follow the lower pullmax die

05/22/2021

Linear stretch for left side A-Pillar inner structure

02/27/2021

Making the inside edge crisp to a rear fender section

05/28/2020

Left front fender, rear upper section fabrication using the #24 lower powerhammer die

Want your business to be the top-listed Autos & Automotive Service in Crossfield?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Crossfield, AB