Sunpal BESS

Sunpal BESS

Share

Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Sunpal BESS, Solar Energy Service, 3th Floor, Xincheng Electric Power Building, No. 398, Ganquan Road, Hefei.

12/05/2026

⚡ 𝐍𝐞𝐰 𝐏𝐫𝐨𝐝𝐮𝐜𝐭 𝐋𝐚𝐮𝐧𝐜𝐡 — 𝐒𝐮𝐧𝐩𝐚𝐥 𝐋𝐢𝐪𝐮𝐢𝐝-𝐂𝐨𝐨𝐥𝐞𝐝 𝐄𝐒𝐒 𝐂𝐨𝐧𝐭𝐚𝐢𝐧𝐞𝐫𝐬
From compact 10ft systems to large-scale 20ft solutions, Sunpal delivers safer, smarter, and easier-to-deploy energy storage for commercial & industrial projects.

🔋 𝟏𝟎𝐅𝐓 𝟑𝟕𝟓𝐤𝐖/𝟕𝟐𝟑𝐤𝐖𝐡 𝐀𝐥𝐥-𝐢𝐧-𝐎𝐧𝐞 𝐋𝐢𝐪𝐮𝐢𝐝-𝐂𝐨𝐨𝐥𝐞𝐝 𝐄𝐒𝐒
✅ Integrated design for fast installation
✅ Compact footprint with clean appearance
✅ In-PACK fire warning & aerosol protection
✅ Enhanced thermal runaway prevention

⚡ 𝟐𝟎𝐅𝐓 𝐀𝐥𝐥-𝐢𝐧-𝐎𝐧𝐞 𝐋𝐢𝐪𝐮𝐢𝐝-𝐂𝐨𝐨𝐥𝐞𝐝 𝐄𝐒𝐒
✅ Hybrid cooling system (liquid-cooled battery + air-cooled PCS)
✅ Highly integrated 3S + cooling + fire protection system
✅ String-based architecture for higher stability & efficiency
✅ Pre-installed & pre-tested before delivery for faster commissioning

Built for 𝐩𝐞𝐚𝐤 𝐬𝐡𝐚𝐯𝐢𝐧𝐠, 𝐛𝐚𝐜𝐤𝐮𝐩 𝐩𝐨𝐰𝐞𝐫, 𝐦𝐢𝐜𝐫𝐨𝐠𝐫𝐢𝐝𝐬, 𝐟𝐚𝐜𝐭𝐨𝐫𝐢𝐞𝐬, 𝐦𝐢𝐧𝐢𝐧𝐠, 𝐥𝐨𝐠𝐢𝐬𝐭𝐢𝐜𝐬 & 𝐮𝐭𝐢𝐥𝐢𝐭𝐲-𝐬𝐜𝐚𝐥𝐞 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬.

📩 DM us for specifications, OEM/ODM support & project pricing.

09/05/2026

📉$𝟓𝟒/𝐌𝐖𝐡: 𝐅𝐢𝐫𝐦 𝐒𝐨𝐥𝐚𝐫 + 𝐒𝐭𝐨𝐫𝐚𝐠𝐞 𝐇𝐢𝐭𝐬 𝐚 𝐍𝐞𝐰 𝐂𝐨𝐬𝐭 𝐁𝐞𝐧𝐜𝐡𝐦𝐚𝐫𝐤💡
IRENA's latest report shows that 24/7 renewable power is now cost-competitive with fossil fuels.

📊 Key highlights:
✅ Solar + storage LCOE now as low as $54–82/MWh
✅ New gas projects in many regions still exceed $100/MWh
✅ Since 2010: Solar costs ↓87% | Battery storage ↓93%
✅ Firm renewable power costs could fall below $50/MWh by 2030
✅ Hybrid solar + wind + storage systems further improve economics and grid flexibility

💡 Why it matters:
𝐑𝐞𝐥𝐢𝐚𝐛𝐥𝐞, 𝐝𝐢𝐬𝐩𝐚𝐭𝐜𝐡𝐚𝐛𝐥𝐞 𝐫𝐞𝐧𝐞𝐰𝐚𝐛𝐥𝐞 𝐞𝐧𝐞𝐫𝐠𝐲 𝐢𝐬 𝐛𝐞𝐜𝐨𝐦𝐢𝐧𝐠 𝐭𝐡𝐞 𝐩𝐫𝐞𝐟𝐞𝐫𝐫𝐞𝐝 𝐬𝐨𝐥𝐮𝐭𝐢𝐨𝐧 𝐟𝐨𝐫 𝐮𝐭𝐢𝐥𝐢𝐭𝐲-𝐬𝐜𝐚𝐥𝐞, 𝐂&𝐈, 𝐚𝐧𝐝 𝐨𝐟𝐟-𝐠𝐫𝐢𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬 𝐰𝐨𝐫𝐥𝐝𝐰𝐢𝐝𝐞.

At Sunpal BESS, we provide 𝐜𝐞𝐫𝐭𝐢𝐟𝐢𝐞𝐝, 𝐦𝐨𝐝𝐮𝐥𝐚𝐫 𝐄𝐒𝐒 𝐬𝐨𝐥𝐮𝐭𝐢𝐨𝐧𝐬 (𝟏𝟎𝟎𝐤𝐖–𝟓𝐌𝐖𝐡+) engineered to maximize ROI in high-irradiance markets — with 𝐟𝐚𝐜𝐭𝐨𝐫𝐲-𝐝𝐢𝐫𝐞𝐜𝐭 𝐩𝐫𝐢𝐜𝐢𝐧𝐠 𝐚𝐧𝐝 𝐠𝐥𝐨𝐛𝐚𝐥 𝐝𝐞𝐩𝐥𝐨𝐲𝐦𝐞𝐧𝐭 𝐬𝐮𝐩𝐩𝐨𝐫𝐭.

06/05/2026

🔋 𝐆𝐥𝐨𝐛𝐚𝐥 𝐏𝐫𝐨𝐣𝐞𝐜𝐭𝐬 𝐍𝐞𝐞𝐝 𝐒𝐦𝐚𝐫𝐭𝐞𝐫 𝐄𝐧𝐞𝐫𝐠𝐲 𝐒𝐨𝐥𝐮𝐭𝐢𝐨𝐧𝐬 — 𝐌𝐞𝐞𝐭 𝐒𝐮𝐧𝐩𝐚𝐥

Join us at 𝐒𝐨𝐥𝐚𝐫 & 𝐒𝐭𝐨𝐫𝐚𝐠𝐞 𝐋𝐢𝐯𝐞 𝐏𝐡𝐢𝐥𝐢𝐩𝐩𝐢𝐧𝐞𝐬 𝟐𝟎𝟐𝟔

We showcase:
✔ Scalable BESS & hybrid ESS solutions
✔ Integration of PV + battery + grid + diesel
✔ Designed for C&I, utility & microgrid projects worldwide
✔ Flexible customization for different markets

💡 Solve real challenges: grid instability, peak costs, energy reliability

🤝 Let's connect and discuss your next project

🎁 Visit our booth for a limited Sunpal gift

📅 𝐌𝐚𝐲 𝟏𝟗–𝟐𝟎 | 📍 𝐒𝐌𝐗 𝐂𝐨𝐧𝐯𝐞𝐧𝐭𝐢𝐨𝐧 𝐂𝐞𝐧𝐭𝐞𝐫, 𝐌𝐚𝐧𝐢𝐥𝐚

🔗 𝐑𝐞𝐠𝐢𝐬𝐭𝐞𝐫 𝐅𝐑𝐄𝐄: https://www.terrapinn.com/SSLPH-TMT

Photos from Sunpal BESS's post 04/05/2026

⚡ 𝐔𝐭𝐢𝐥𝐢𝐭𝐲-𝐒𝐜𝐚𝐥𝐞 𝐄𝐱𝐞𝐜𝐮𝐭𝐢𝐨𝐧 — 𝐋𝐢𝐯𝐞 𝐟𝐫𝐨𝐦 𝐂𝐡𝐚𝐝 🔋🏭
𝐒𝐮𝐧𝐩𝐚𝐥 𝟐.𝟓𝐌𝐖 + 𝟓𝐌𝐖𝐡 𝐜𝐨𝐧𝐭𝐚𝐢𝐧𝐞𝐫𝐢𝐳𝐞𝐝 𝐁𝐄𝐒𝐒 project is under installation — with our engineering team on-site ensuring every step meets project standards.

🏗️ 𝐖𝐡𝐚𝐭 𝐲𝐨𝐮 𝐬𝐞𝐞:
✔ System installation & integration in progress
✔ Field-level wiring, testing & setup
✔ Real deployment — not just drawings

💡 𝐅𝐨𝐫 𝐄𝐏𝐂𝐬 & 𝐝𝐞𝐯𝐞𝐥𝐨𝐩𝐞𝐫𝐬:
Reliable delivery, faster commissioning, and systems built for harsh environments.

We don't just supply BESS — we make it work on-site.

Want your business to be the top-listed Contractor in Hefei?
Click here to claim your Sponsored Listing.

Telephone

Address


3th Floor, Xincheng Electric Power Building, No. 398, Ganquan Road
Hefei
230000