GTCI Constructors
One of Al Tawakol Group Providing innovative EPC solutions
25/12/2025
“The road to success is always under construction.” – Lily Tomlin
This Christmas, we reflect on the value of building steadily, embracing every step, and laying foundations for continued progress.
On this special occasion, we convey our sincere wishes for peace, harmony, and a meaningful Christmas season.
GTCI Energy & Infrastructure wishing you a Merry Christmas!
22/06/2025
With the turbine and generator now securely installed, work at the NCMP 15 MW Combined Heat & Power Plant continues at full throttle.
From pouring HRSG foundations to advancing civil works across the site, our collaboration with Intro Utilities
S.A.E. is driving tangible results. Every phase brings us closer to powering industrial growth with reliability and precision.
The energy future is being built one milestone at a time.
Eid Mubarak from GTCI! 🌙✨
As we celebrate this joyous occasion, we extend our warmest wishes to our partners, clients, and community.
May Eid bring peace, prosperity, and continued growth to all.
01/06/2025
GTCI is proud to report continuous momentum at the NCMP 15 MW Combined Heat & Power Plant.
In collaboration with Intro Utilities S.A.E, our site progress reflects the precision and pace driving this vital energy project forward:
• Gas Turbine and Generator successfully received on-site
• HRSG foundation concrete poured and curing completed
• Control building columns poured and start formwork
For the first slab.
Backfilling around GT & HRSG FOUNDATION.
Stay tuned as we deliver the infrastructure that powers Egypt’s future.
28/05/2025
Where Momentum Meets Innovation
On the vast stretch of Egypt’s high speed railway, Tahta Station is rising with purpose and precision.
- Powered by next generation engineering and streamlined ex*****on.
- Construction progress exceeding expectations moving swiftly and efficiently.
- Designed to be a key transit node connecting Upper Egypt to the national network.
- A project that reflects Egypt’s ambition for faster, smarter, and sustainable transport.
This is more than a site it’s a signal of what’s next.
13/05/2025
Tahta High Speed Rail Station isn’t just under construction it’s ahead of schedule.
Here’s a closer look at how we’re redefining speed and precision on the ground:
- Rapid development pace with streamlined ex*****on.
- State of the art engineering adapted for complex terrain.
- Dedicated teams working with precision and urgency.
- Laying the groundwork for a faster, better-connected Egypt.
From blueprint to reality, Tahta is on track to become a landmark of innovation in motion.
08/05/2025
We’re proud to announce the official signing of the contract between GTCI and Intro Utilities S.A.E marking the beginning of a strategic partnership dedicated to delivering the NCMP 15 MW Combined Heat & Power Plant.
This milestone reflects our shared commitment to industrial excellence, energy efficiency, and sustainable infrastructure development.
Together, we’re powering forward with innovation, precision, and purpose.
Stay tuned for updates as this transformative project unfolds!
06/05/2025
Progress continues to gain momentum at the NCMP 15 MW Combined Heat & Power Plant!
GTCI is proud to report several new milestones:
Gas Turbine & Generator arrival zone is prepped and ready for unloading
HRSG foundation is fully prepped and ready for concrete pouring
Concrete pouring for the Main Control Building columns has been successfully completed
These achievements reflect our dedication to precision, planning, and ex*****on as we power ahead on one of Egypt’s leading industrial energy projects.
30/04/2025
Innovation isn’t a goal it’s the foundation.
At Tahta Station, rapid progress and smart engineering are driving one of Egypt’s most important transport milestones.
- Accelerated Progress: Construction moving ahead faster than ever.
- Innovative Solutions: Using advanced techniques to deliver world-class infrastructure.
- Transformational Impact: Connecting communities, reducing travel time, and opening new economic opportunities.
At Tahta, every day counts and every achievement brings Egypt’s high speed future closer.
26/04/2025
Solid Foundations, Stronger Futures!
At the NCMP 15 MW Combined Heat & Power Plant, GTCI is progressing steadily with the Main Control Building foundations.
Each step marks a critical phase in establishing the operational backbone of this vital project, ensuring durability, precision, and world-class standards.
Our teams are committed to driving excellence and innovation, laying the groundwork for Egypt’s future in industrial energy.
Stay tuned as we continue shaping tomorrow!
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
78 EI-Nozha Street, AImazah, Heliopolis
Cairo
Opening Hours
| Monday | 9am - 5pm |
| Tuesday | 9am - 5pm |
| Wednesday | 9am - 5pm |
| Thursday | 9am - 5pm |
| Sunday | 9am - 5pm |