In a remarkable feat of engineering and logistics, a massive concrete pour took place in San Diego, USA. The project involved a carefully orchestrated ballet of 258 concrete trucks, which worked together to pour a staggering 11,500 yards of concrete in a single, continuous operation. The pour commenced at 5 am and was completed by 3 pm, requiring an impressive display of coordination and efficiency. This translates to an average of 26 trucks pouring concrete per hour, or an astonishing rate of one truck every 2 minutes and 20 seconds.