DIAS - GS

DIAS - GS

Share

DIAS is regarded as No.1 coaching institute in India for offering guidance in Science Optionals and GS . Contact : 011-65009600 , 9350934622.

29/10/2016

India Ranks Poorly In Commonwealth Youth Index
http://diasindia.com/india-ranks-poorly-in-commonwealth-youth-index/

India Ranks Poorly In Commonwealth Youth Index India Ranks Poorly In Commonwealth Youth Index India has ranked very poorly at 133 in a new Global Youth Development Index compiled by the Commonwealth Secretariat on the countries’ prospects for young people in employment, education, health, civic and political spheres. India ranked 133rd in the in...

Photos 22/10/2016

India Signs Guarantee Agreement with the World Bank

A Guarantee Agreement for World Bank (IBRD) lending of US$ 650 million to the Dedicated Freight Corridor Corporation of India Ltd. (DFCCIL) for Eastern Dedicated Freight Corridor-III (EDFC-III) Project has been signed between the Government of India and the World Bank.

For more Please Click here : https://www.facebook.com/diasindia123/posts/952156351555445:0

India Signs Guarantee Agreement with the World Bank

A Guarantee Agreement for World Bank (IBRD) lending of US$ 650 million to the Dedicated Freight Corridor Corporation of India Ltd. (DFCCIL) for Eastern Dedicated Freight Corridor-III (EDFC-III) Project has been signed between the Government of India and the World Bank.

About Eastern Dedicated Freight Corridor-III project:

The objective of the EDFC-III Project is to augment rail transport capacity, improve service quality and enhance freight carriage throughput on the 401 km Ludhiana-Khurja section of the Eastern Dedicated Freight Corridor.

It also aims to develop institutional capacity of DFCCIL to build, maintain and operate the entire DFC network.

This project is in continuation of Phase-I and II of the EDFC Projects being implemented by the DFCCIL with the World Bank loan of US$ 975 million and US$ 1100 million respectively on the Dadri-Khurja-Kanpur and Kanpur-Mughal Sarai stretches of the Eastern Rail Corridor (Ludhiana-Delhi-Kolkata).


Significance of this project:

The project will directly benefit the power and heavy manufacturing industries of Northern and Eastern India, which rely on railway network for transportation of their material inputs and also for the distribution of bulk processed and semi-processed commodities and consumer goods. Railway passengers will also be benefitted through decongestion of the existing passenger lines.
Sources: pib.

/IFoS in
and in
/IFoS -cum-mains
in
/IFoS in
/IFoS in
/IFoS in
/IFoS
/IFoS
/IFoS in
/IFoS /
/ in
and and and and
and Affairs and
Survey
and Culture &Culture .&Test.

Photos 21/10/2016

In revised offer, China wants to work as construction contractor in Gwadar

China has withdrawn its offer of setting up a liquefied natural gas (LNG) terminal at Gwadar Port on the build-and-operate model and now wants to work as an engineering, procurement and construction (EPC) contractor for the project.

“In response to the revision of offer by China, Pakistan will own and operate the terminal and award EPC contract to the Chinese company working on the Gwadar LNG pipeline project under a government-to-government arrangement,” an official told The Express Tribune.

Chinese offer to finance whole $2b LNG project

The government is also considering setting up two jetties at Gwadar Port with two floating LNG terminals at a cheaper cost for handling 1.2 billion cubic feet of imported gas per day (bcfd).

According to the official, a meeting of the price negotiation committee has already been held. The Exim Bank of China will provide financing at the rate of London Inter-bank Offered Rate (Libor) plus 2%.

During initial negotiations, the official said, it was discussed that tolling fee for the Gwadar LNG terminal would be 30 to 32 cents per million British thermal units (mmbtu) due to lower government profit.

Earlier, the lowest bidder for the second LNG terminal, to be set up at Port Qasim, had quoted a fee of 41.70 cents per mmbtu.

The Ministry of Petroleum and Natural Resources is working on the project plan for the Gwadar LNG terminal, which will be sent to the Planning Commission for approval.

According to the official, one more floating ship will be installed at Gwadar Port with 10% additional cost. It will help store LNG in case of congestion at Karachi Port.

China irked by delay in Gwadar project

The Executive Committee of National Economic Council (Ecnec) has given its approval for the Gwadar LNG pipeline, which will give a good signal to Iran, as Pakistan has planned to extend the pipeline by 80 km to connect it with the Iranian border.

The government is pushing ahead with this project as an alternative because of international sanctions on Iran in the past. The official pointed out that the government would be able to import 2.4 bcfd of LNG through the terminals at Karachi and Gwadar. This way, the entire deficit of 2.4 bcfd will be met.

At present, the country produces 4 bcfd of natural gas compared to demand for 6.4 bcfd.

One LNG terminal is already running at Port Qasim with a handling capacity of 600 million cubic feet per day (mmcfd). A contract for second terminal at the port, which will also have the 600-mmcfd capacity, has been awarded and work is going on.

Published in The Express Tribune, October 21st, 2016.

/IFoS in
and in
/IFoS -cum-mains
in
/IFoS in
/IFoS in
/IFoS in
/IFoS
/IFoS
/IFoS in
/IFoS /
/ in
and and and and
and Affairs and
Survey
and Culture &Culture .&Test.

Photos 17/10/2016

GS Answer Writing Sessions for CSE 2016 with Test Series.
50+ Hours of Power Packed, Compact Classroom Programme.

Start from 20th October at 11:00 AM.
By Mudit Jain (Score 426+ Marks in CSE 15/14).

For detail call us on: 9350934622.

Want your school to be the top-listed School/college in Delhi?
Click here to claim your Sponsored Listing.

Category

Telephone

Address


18/1, 02nd Floor Old Rajendra Naga
Delhi
110060

Opening Hours

Monday 9am - 8pm
Tuesday 9am - 8pm
Wednesday 9am - 8pm
Thursday 9am - 8pm
Friday 9am - 8pm
Saturday 9am - 8pm