Riddance Engineering
RIDDANCE GROUP, one of the Authorised Composite (3S) Dealer of Greaves Cotton Ltd for Sales, Service & Spare parts.
05/06/2026
Before the monsoon sets in, ensuring the health of your DG earthing & grounding system is critical for safe and reliable power backup.
With increased soil moisture, heavy rainfall, and possible water ingress, earthing systems are often the first to get affected—leading to safety risks, equipment issues, and unexpected DG failures during critical hours.
A timely pre-monsoon inspection helps identify and prevent these risks before they escalate.
Key areas to focus on:
✔ Earth pit resistance testing
✔ Condition assessment of earth electrodes and corrosion check
✔ Tightness and integrity of all earthing connections
✔ DG neutral grounding verification
✔ Lightning protection system inspection (if applicable)
Riddance Engineeringprovide end-to-end DG earthing and grounding inspection services with a strong focus on safety, compliance, and reliability. Our team conducts detailed site assessments, identifies potential risk points, and provides practical corrective recommendations to ensure your system is monsoon-ready.
Proactive inspection today helps avoid unexpected downtime tomorrow.
02/06/2026
🔧 The Engineers Behind Reliable Power Solutions ⚡
At Riddance Engineering, every successful project is a result of the dedication, technical expertise, and problem-solving mindset of our engineering team.
From site surveys and system design to installation, testing, and commissioning, our engineers work tirelessly to ensure that every power solution delivered meets the highest standards of quality, safety, and reliability.
Their commitment to excellence helps industries, commercial establishments, and institutions stay powered when it matters most.
A big appreciation to all the engineers who turn challenges into solutions and keep businesses running smoothly every day.
21/05/2026
In DG Set installations, cable glands are not just accessories — they are critical for safety, reliability, and long-term performance of the electrical system.
A proper gland termination ensures:
✔ Secure cable holding & strain relief
✔ Protection against dust, moisture & vibration
✔ Better earthing continuity
✔ Prevention of cable damage due to movement or mechanical stress
✔ Safer and cleaner termination inside DG terminal boxes
Without proper glands, cables can loosen over time due to engine vibration, leading to:
❌ Heating issues
❌ Loose connections
❌ Water/dust ingress
❌ Higher chances of short circuit or insulation failure
❌ Reduced life of cables and terminals
However, selecting the wrong gland size or improper installation can also create issues such as:
⚠ Over-tightening damaging cable insulation
⚠ Incorrect earthing continuity
⚠ Difficulty during maintenance if poor quality glands are used
For every DG installation, correct gland selection as per cable size, armouring type, and site conditions is equally important as selecting the right cable itself.
At Riddance Engineering, along with the support and technology of Greaves Cotton Limited, we always emphasize proper termination practices to ensure safe, reliable, and long-lasting DG installations for our clients.
A small component, but a major role in electrical safety & system reliability.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Mumbai
Opening Hours
| Monday | 10am - 7am |
| Tuesday | 10am - 7am |
| Wednesday | 10am - 7am |
| Thursday | 10am - 7am |
| Friday | 10am - 7am |
| Saturday | 10am - 7am |