Alfa Engineering LTD

Alfa Engineering LTD

Share

Anything worth doing, is worth doing well.

30/05/2026

We installed this system on 5th April 2025
We used 4 units of longi 355w panel, Gospwer 12V 1.5kw Hybrid inverter and SPL 2.56kwh 12V battery.
Location: Akwakuma, Imo State.

The system is still working fine till now and it is powering their duplex so most times it's about load management.

23/05/2026

If your AC installer does not have the tools as seen in this video he doesn’t have the right to install that your AC, he is unprofessional.
the tools in this video to professionally install split unit air conditioning systems.

It doesn’t end there, as a professional( educationally an Engineer, field guru), I have mastered the art of avoiding your beams during installations, being a trick I learnt the hard way shaa.

23/05/2026

This is how solar can cause fire hazards!

Buy the correct type of cable and make sure the cables are properly sized!

In conclusion hire a professional like

What do you think caused this ?

Want your business to be the top-listed Engineering Company in Onitsha?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Onitsha