Nepal Engineering Service
Welcome all engineers and engineering students. ❣️🙏🇳🇵
Keep learning and stay updated. 😊🙏
27/04/2026
Bagmati pradesh bishesh MCQ Model set for
Prepared by: - Nepal Engineering Service team.
Q. The Purpose of foundation is:
A) To distribute the weight of the structure over large area.
B) To prevent unequal settlement.
C) To provide a level surface for building operation.
D) All of above.
Q. The contractor's overhead added to the cost of work is .............. of the cost of work.
A) 5%
B) 10%
C) 13%
D) 15%
Q. The maximum design gradient for vertical profile of a road is:
A) ruling gradient
B) exceptional gradient
C) limiting gradient
D) minimum gradient
27/04/2026
???
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
Ring Road
Kathmandu