LOAD SHEDDING SCHEDULE ON MAY 27, 2026 (WEDNESDAY)
This load shedding schedule is based on the currently available supply from the SUWECO Diesel Power Plant, the reduced output of all hydro power plants due to low water levels, and the expiration of the Emergency Power Supply Agreement (EPSA).
We strongly advise all consumers to treat all lines as LIVE, as power restoration may occur at any time without prior notice depending on the operating capability and availability of the power plants.
Current Power Situation:
Total Available Supply: up to 10.010 MW
Estimated Demand: 17.530 MW
Estimated Supply Deficit: up to 7.200 MW