DARMA Project

DARMA Project

Share

The project aims to create a tool for evaluating earth dam safety through data analysis.

Photos from DARMA Project's post 02/06/2025

DARMA Team site visit on Magat Dam.

The DARMA Team, in coordination with NIA Central Office - Design and Specifications Division (DSD) and Irrigation Engineering Center (IEC), NIA MARIIS Head Office - Engineering and Operations Division (EOD), and NIA MARIIS DRD - Flood Forecasting and Instrumentation Section (FFIS) and Civil Works Section (CWS), conducted a visual surveillance inspection of the Magat Dam on May 20–21, 2025. The activity aimed to assess the current condition of the embankment dam, focusing on its safety and structural stability.

Photos from DARMA Project's post 29/05/2025

DARMA Team site visit.

Kickoff meeting and site inspection instruments meeting with NIA-MARIIS-DRD personnel.

Photos from DARMA Project's post 28/05/2025

DARMA Team courtesy call with MARIIS Head Office Department Manager, Engr. Gileu Michael Dimoloy.

Photos from Mariis Dam and Reservoir Division's post 28/05/2025
Want your business to be the top-listed Engineering Company in Manila?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


2401 Taft Avenue , Malate
Manila
1004