JinTech Solar and Engineering Services

JinTech Solar and Engineering Services

Share

Solar Energy, PV design and Installation

06/09/2024

Shout out to my newest followers! Excited to have you onboard!

Misaq Khan, Anya Henry, Eregwa Ganira

Photos from JinTech Solar and Engineering Services's post 06/08/2024

The inverter can’t sense the load, during grid mode, upon inspection we have checked the CT line and it seems the cable was cut.
Second, the ATS was not able to transfer automatically during DU block out.
Third, shorted power outlet was found in the kitchen area. All of these concerns were corrected.

Done Replacing ATS, CT Sensor cable with new line of conduit and power outlet. Thus, the inverter is now on normal operation.

Team headed by Gonzales.

If you have issues and concerns with your solar power plant, please contact us.

Jintech
Viber 09913680325

Want your business to be the top-listed Engineering Company in Mexico?
Click here to claim your Sponsored Listing.

Category

Telephone

Website

Address


Lot 8. , Maningning 2, Sto. Domingo
Mexico
2021