BERD

BERD

Compartilhar

Bridge Engineering Research & Design
One Bridge One Solution

03/02/2026

In this edition of the BERD Bridges Bulletin, we go inside the engineering challenge that is Sterbecke-Brücke, part of Germany’s A45 replacement programme.

Discover how the M57-I underslung MSS, equipped with our Organic Prestressing System (OPS), was used in the span-by-span construction of cast in-situ decks with precision and control.

📨 Read the full story: https://mailchi.mp/berd/berd-bridges-bulletin-feb26

Quer que o seu negócio seja a primeira Serviço De Equipamentos em Matosinhos?
Clique aqui para solicitar o seu anúncio patrocinado.

Endereço


Edifício Olympus I/Avenida D. Afonso Henriques 1462, 2º
Matosinhos
4450-013