RMF Engineering

RMF Engineering

Share

Experience the RMF difference through prompt responsiveness, industry-leading tech savvy, and projec offices.

Photos from RMF Engineering's post 06/30/2026

Construction is underway for major campus-wide electrical upgrades at Williams College!

The project will increase the campus medium voltage distribution system from 4160V to 13.8kV, replace 33 transformers, install 9000 linear feet of new underground ductbank, provide two new switching stations and a parallelling switchgear.

These critical improvements will automate switching, enhance reliability and capacity, and enable future growth and decarbonization strategies.

Construction is being managed by BOND Building Construction.

Photos from RMF Engineering's post 06/22/2026

Last week, RMF celebrated the opening of the new Mount Pleasant Waterworks Fleet & Facilities Center, a space built to keep essential operations moving efficiently and safely as the community grows.

The 14,300 SF facility brings together two heavy‑duty maintenance bays, four light‑duty bays, a fabrication bay, administrative areas, and supporting infrastructure. Our role centered on creating a dependable environment for fleet maintenance and daily operations, providing MEP design and working with Mount Pleasant Waterworks, DP3 Architects and Hood Construction Company, Inc.

Want your business to be the top-listed Equipment Service in Baltimore?
Click here to claim your Sponsored Listing.

Telephone

Address


5520 Research Park Drive, Suite 300
Baltimore, MD
21228