GEFCO
GEFCO, founded in 1931, manufactures high-performance portable drilling rigs for water well, environmental, and construction use.
Built. Tested. Verified.
After assembly, this PTO system goes through a 6-hour run test in the clean room, including heat testing to verify performance before moving forward.
Every function checked.
Every system tested.
Ready for the next step.
One of three GEFCO 30Ks heading to the South Atlantic Jubilee in Myrtle Beach, South Carolina.
This 30K is currently on the production floor and will be one of the rigs on display at the show.
Featuring new options and built for the toughest drilling conditions.
Stop by, see the equipment up close, and connect with the GEFCO team at Jubilee.
Another rig getting started up in the field.
This one is for Moore Well Drilling in Prince Edward Island, Canada.
Our team was there to support the startup, answer questions, and help get the rig ready for work.
No matter how far, we keep you drilling.
Out in Oklahoma with CP Drilling of Leedey, Oklahoma.
Rex and Robin Penry are putting their GEFCO 40K to work on a cathodic protection job for a pair of pipelines.
Our Sales and Engineering teams were there to see the rig working in real field conditions, hear direct customer feedback, and look at ways to keep making the 40K better.
Real jobs give real feedback.
Thank you to Rex, Robin, and the CP Drilling team for letting us visit and share the work.
Built for the toughest jobs.
HeavyEquipment BuiltForTheToughestJobs
Three rigs on the GEFCO test track.
Every rig. Every system. Every function. Put to work.
Before our machines make it to the field, our team checks every function — running systems, verifying performance, and putting each rig through the details that matter.
From operation checks to pull testing at capacity, every build is tested to be ready for the crews that depend on them.
Built for the toughest jobs.
Manufacturing BuiltForTheToughestJobs
Every part. Every tool. Every station.
Everything has its place.
Clear labeling keeps the assembly line moving, helps our teams work efficiently, and keeps every build moving forward.
Built for the toughest jobs.
Steel moves fast when the team knows what they’re doing.
From frame installation to hydraulics, controls, and final assembly, every station keeps the build moving forward.
No wasted motion.
No standing around.
Just real teamwork and real production.
Built for the toughest jobs.
Out in Oklahoma City checking in with Sharp Drilling and their 2011 GEFCO 30K.
200-foot well.
6-inch diameter.
Completed in just 2 hours.
When we mentioned how fast they were moving, the response was simple:
“This rig helps a lot. It’s a beast.”
Good crews move fast.
The right rig helps them move even faster.
Thank you Scotty Sharp and the Sharp Drilling crew for trusting GEFCO in the field.
Built for the toughest jobs.
Out in the field. Working. Producing. Keeping the job moving.
The 100th GEFCO rig wasn’t built for a showroom floor. It was built for the toughest jobs.
Thank you to every customer, operator, technician, and crew that’s been part of the journey to 100.
Built to run.
Built to work.
Built to keep drilling.
HeavyEquipment WaterWellDrilling OnSite FieldWork RigLife
On location in Maine with Paul and Brandon Kelsey of Reilly Well Drilling for the startup of their new 30K.
Beautiful weather, a new rig, and another machine getting ready to go to work in the field.
Thank you for trusting GEFCO.
Built for the toughest jobs.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
680 Conroe Park West Drive
Conroe, TX
77303
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |