Lead Engineering Contractors, LLC
General Contractor
Heavy Civil Transportation Infrastructure Projects
Bid-Build, Design Build, Const
08/26/2022
LEAD (www.LEAD-EC.com) was recognized for its Outstanding Safety Performance during 2021 at the recent FTBA Convention held in Amelia Island, FL. LEAD’s organization, from its ownership, management and every supervisory and craft team member has a Safety First mindset. Every team member carries their day to day duties within the strong belief that every accident is preventable. The hard work and results obtained towards working accident free on every jobsite, one day at a time, is recognized in multiple ways by the LEAD organization. LEAD’s safety results, and the constant drive to improve them, makes every team member at LEAD a well deserved winner of this FTBA recognition.
06/03/2022
LEAD (www.LEAD-EC.com) is on the final stretch to deliver another successful project as it approaches the completion of the FDOT District 4 I-95 / Copans Road Interchange Improvements project in Pompano Beach, FL. The improvements under this contract consist of reconstruction, widening, milling and resurfacing, I-95 bridges widening, sidewalk, drainage improvements including curb and gutter, shoulder gutter and storm water ponds, pipe desilting, construction of noise walls, retaining walls, pier protection barrier walls, express lane delineators, installation of ITS conduits and equipment, signing and pavement markings, vehicle detection, ITS cameras, lighting, landscaping and interchange modification of on and off ramps along SR 9 (I-95).
05/27/2022
The LEAD (www.LEAD-EC.com) team is making solid progress on the construction of the FDOT State Road 5 (US-1) from SR 862 (I-595) to SR 842 Broward Boulevard Project. The improvements include rehabilitating the structural, mechanical, electrical, architectural, and life safety components of the Henry E. Kinney Tunnel; milling and resurfacing SR 5/ US-1 from Rio Vista Boulevard to south of the Tunnel; installing Intelligent Transportation System (ITS) along SR 5/US-1, extending the Tunnel top to accommodate a pedestrian plaza which will include new fountains, seating facilities, redesigned brick pavers, artificial turf and landscaping installation, and reconstructing the intersection of Las Olas Boulevard at SE 6th Avenue. LEAD continues to deliver the Best Service!
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
5757 Blue Lagoon Drive, Ste 240
Miami, FL
33126
Opening Hours
| Monday | 8am - 6pm |
| Tuesday | 8am - 6pm |
| Wednesday | 8am - 6pm |
| Thursday | 8am - 6pm |
| Friday | 8am - 6pm |