MAX 360
Your Dedicated VDC Partner
06/22/2026
LOD isn’t just a number on a BIM requirement. It’s a decision that affects every coordination deliverable that follows. 🏗️
Getting the LOD requirement wrong at the start of a project doesn’t just affect the model. It affects the clash detection, the shop drawings, the fabrication, and ultimately what gets built.
MAX 360 ensures your BIM models are at the right LOD - at the right phase - so coordination never gets compromised by a decision made at project kickoff.
06/19/2026
Most electrical delays were decided weeks before construction started. ⚡
When conduit routing isn’t coordinated, panel schedules are incomplete, and cable trays aren’t clash-checked - the field pays for it.
Swipe through to see the three mistakes that show up on almost every project.
👉 Save this before your next electrical project kicks off.
05/14/2026
The best AEC firms don’t settle for average VDC support. Neither should yours.
MAX 360 embeds elite VDC specialists directly into your team - aligned to your workflow, your standards, and your vision.
Nearly a decade. World-class AEC firms. Zero compromise.
The right partner changes everything - contact us today. Link in bio.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
177 E Colorado Boulevard Suite 200
Pasadena, CA
91105