PDQ

PDQ

Share

Healthy, up-to-date machines — automatically. Streamline your patch management and software deployment processes — whether you manage 50 machines or 5,000.

07/02/2026

Zero trust didn’t become a thing because IT teams wanted another framework to memorize. It became a thing because the old assumptions broke.

Robert Kulp has been in IT long enough to remember when the network felt a lot smaller. Fewer devices. Fewer entry points. A cleaner line between “inside” and “outside.”

That job doesn’t exist anymore.

The new reality involves more verification, less convenience, and fewer comfortable assumptions.

Which is annoying. And also necessary.

Watch the full PDQ Patch Notes episode with Robert Kulp: https://hubs.ly/Q04mY1ms0

07/01/2026

The first PDQ "aha" moment usually hits when something deploys faster than you expected.

Not after building some giant, over-engineered policy. Not after clicking through a maze of settings.

It’s when groups, packages, and automations start working together and you realize routine updates don’t have to eat your afternoon.

A machine lands in the right group. The right package is ready. The deployment runs. Fast. Quietly. Without you babysitting every device like it’s going to wander off and break something.

When it’s set up right, the first “wait … that’s it?” moment comes pretty fast.

Want your business to be the top-listed Computer & Electronics Service in South Salt Lake?
Click here to claim your Sponsored Listing.

Address


2200 S. Main Street STE 200
South Salt Lake, UT
84115