Pro-Custom Drywall LLC
We are a family operated business providing services all over the Garden State.
The first step is protecting the finished epoxy floors and preparing the work area. Proper site preparation is fundamental to delivering a quality finish and protecting completed surfaces throughout every phase of the job.
The first step is protecting the finished epoxy floors and preparing the work area. Proper site preparation is fundamental to delivering a quality finish and protecting completed surfaces throughout every phase of the job.
We remember those who served, sacrificed, and never came home. Their bravery will never be forgotten.
3 or 4 screws on the center field? 🤔
Most homes are built with 16” on center spacing, but on this project, we’re dealing with 12” on center.
We lean towards Option B (3 screws in the center field) since we are dealing with 12” on center. If that wasn’t the case, I’d definitely recommend all screws on the perimeter and 4 in the center field to keep everything tight.
How do you guys handle a 12” O.C. ceiling? Let’s talk shop in the comments. 📐👨🏻💻
The bigger the sheets, the smoother the finish! 🏠💥
We don’t just hang board, we build for the long haul. Using the largest sheets available means fewer joints, which leads to a much higher quality end result for the homeowner.
What sets our quality apart?
✅ Maximized Sheet Size: Fewer seams = a flawless, flatter wall.
✅ Secure Fastening: Full screw pattern with 4 screws in the center field on all walls and ceilings for maximum strength.
✅ Crack Prevention: We apply mesh tape on the edges of all corner beads to prevent cracks in the future. 🛡️
When you want a finish that lasts, you don't cut corners—you reinforce them. DM us to get your next project started right! 📩🔨
Click here to claim your Sponsored Listing.
Category
Address
Toms River, NJ
Opening Hours
| Monday | 7am - 7pm |
| Tuesday | 7am - 7pm |
| Wednesday | 7am - 7pm |
| Thursday | 7am - 7pm |
| Friday | 7am - 7pm |