The Mary E. Switzer Project page is a reporting page established to allow fans to view the progress of this Phased Modernination of the Mary Switzer Building.
03/18/2010
is progressing well. The project is even slightly ahead of schedule. Currently major work is being performed on the sixth and seventh floor and as a result of this work there may be intermittent noises heard on the lower occupied floors during normal working hours (8:30 AM – 5:00 PM). This noise is as a result of resolving “spot” condition, cutting material, anchoring a missing an unscheduled event. This may be a bit of an inconvenience but is not intended to be ongoing for any significant amount of time. All continuous noise work is scheduled to stop at 8:00 AM every morning unless otherwise scheduled. Thanks for all your cooperation.
01/28/2010
Photos from December and January