The Mary E. Switzer Project page is a reporting page established to allow fans to view the progress of this Phased Modernination of the Mary Switzer Building.

6th & 7th Flr Activity 03/18/2010

is progressing well. The project is even slightly ahead of schedule. Currently major work is being performed on the sixth and seventh floor and as a result of this work there may be intermittent noises heard on the lower occupied floors during normal working hours (8:30 AM – 5:00 PM). This noise is as a result of resolving “spot” condition, cutting material, anchoring a missing an unscheduled event. This may be a bit of an inconvenience but is not intended to be ongoing for any significant amount of time. All continuous noise work is scheduled to stop at 8:00 AM every morning unless otherwise scheduled. Thanks for all your cooperation.

Updated Pictures 01/28/2010

Photos from December and January

Want your business to be the top-listed Contractor in Washington D.C.?
Click here to claim your Sponsored Listing.

Website

Address


Washington D.C., DC
20024